Saturday, May 21, 2016
Update of IT Modernisation Project as on 31-03-2016
The latest position of implementation is as follows:
·     Primary Data Centre has started functioning at Navi Mumbai since 3rd April, 2013.
·     Disaster Recovery Centre has been powered on at Mysore on 15-05-15.
·   28014 Departmental Post offices including mail offices and administrative offices have been networked at single Wide Area Network (WAN) and connected to Data Centre.
·     Core Banking Solution (CBS) has been rolled out in 20494 Post Offices.
·     ATMs have been installed in 759 locations.
·     Core Insurance solution (CIS-PLI) has been rolled out in 25406 Post Offices.
·   CSI Wave-1: Implementation of IDAM (Identity and Access Management) and SSO (Single Sign on) are under progress in Mysore Division.
·  Other Wave-1 security components are at Data Centre level and they are under implementation.
·    Anti-virus installed in 74,500 desktops 
     
Enterprise Monitoring System under CSI Wave-1 is a Data Centre level component and it is under implementation.
Enterprise Monitoring System under CSI Wave-1 is a Data Centre level component and it is under implementation.
·      CSI wave 2 Roll out: CSI has been rolled out In Mysore Division from 01.10.2015.
·     Two HOs and Sixty three SOs were migrated to CSI in addition to NSH Mysore.
·     The following Legacy applications were integrated with CSI. 
     eMO 
     eMO ePayment 
     Register net/ Parcel net 
     Speed net 
     IPS 
     IFS 
     RMFS 
     NPS 
     UAT for Wave 2 & 3 solutions is in progress (Cycle 1 & 2 completed).
·    CSI Integration UAT III completed from 22-06-2015 to 27-06-2015 at Hyderabad.
·    Closure of defects of UAT III completed from 09th to 11th July 2015 at Hyderabad. 
      Dispatch of RH Handheld devices started.
·    3546 devices have been dispatched to Branch Post Offices of Pilot circles.
No comments: